• Skip to main content
  • Skip to secondary menu
  • Skip to footer
  • Add Event
  • Directory
  • Submit News

MyZA

Free Events Calendar and Business Directory

  • SA News
  • Contact
  • Submit News
  • Directory
  • Quickly Add Listing

Platinum Group Metals Ltd. Advances Resource Drilling at Waterberg; Multiple Thick, High Grade Mining Areas Targeted in Upcoming Pre-Feasibility Study

17 March 2016 By admin

VANCOUVER, BRITISH COLUMBIA and JOHANNESBURG, SOUTH AFRICA–(Marketwired – March 17, 2016) – Platinum Group Metals Ltd. (TSX:PTM)(NYSE MKT:PLG) (“Platinum Group” or the “Company”) is pleased to announce that over 90% of recent infill drilling on the Waterberg deposit has successfully intersected the “T” and “F” targeted layers. The deposit has been extended both up-dip and at depth.

New features from recent drilling include:

  • Multiple High Grade “Super T zone” intercepts including 13.91 g/t platinum, palladium and gold (“3E”) over 11.87 meters; and
  • Multiple “Super F zone” intercepts creating targets for shallow resources at less than 300 meters vertical from surface.

Confirmation drilling has delineated large scale F zone blocks at grades higher than the deposit average which can be separately modelled and prioritized for mining in an ongoing Pre-Feasibility Study. New high grade T zone blocks are also emerging at depth. Additional drilling to offset these new high grade T zone intercepts has been approved by the Waterberg Joint Venture and is now underway. The Japan Oil, Gas and Metals National Corporation (“JOGMEC”) is funding the current drilling and Pre-Feasibility engineering work.

R. Michael Jones, President, CEO and co-founder of Platinum Group Metals said “Definition drilling is allowing us to model Waterberg as a series of potential mining areas rather than as one 13 kilometer deposit. Given the scale of known resources, and being only 140 meters from surface, Waterberg is certainly big and shallow. The definition drilling results allow us to target the best grade in five large potential mining blocks, each at a scale typical of a stand-alone South African platinum mine shaft or decline complex. The new emerging high grade T zone adds a completely new dimension. Waterberg will now be considered a mining district to be prioritized rather than as a single deposit in the ongoing Pre-Feasibility Study.”

The 27 new drill holes (15,500 meters of core) reported herein, plus results from 265 earlier holes (249,000 meters of core) completed for the previous July 2015 resource estimate, outline five potential mining areas: T zone, Super T, Central Super F, Boundary Super F and Northern Super F. A total of 7 holes and 6,000 assays are still pending at this time from the ongoing drill program.

Higher grade intercepts reported herein, combined with earlier higher grade cuts, create specific blocks to be considered in pre-feasibility mine planning and engineering work. An updated resource calculation is in progress, modelled on 2.5 g/t, 3.5 g/t and 4.0 g/t platinum, palladium, rhodium and gold (“4E”) lower cut-off grades for the identified blocks.

New Highlight Drill Results

Super T borehole details are listed below. The term “Super” designates an intercept thickness of greater than 6 meters at over 5 g/t. In the F Zone “Super is used for an intercept of more than 10 meters. True thickness is approximately 79% of the reported intercept width. It is logical to consider intercepts at up to 6 meters vertical thickness for standard mechanized mining methods. At 6 to 10 meters thick other methods for mechanized extraction can be considered. Beyond 10 meters thick bulk underground mining methods may be considered.

To put the Super T and Super F intercepts into perspective, a common measure for mine planning comparison in layered deposits is thickness multiplied by grade measured in centimeter grams per tonne (“cmg/t”). An intercept of 10 meters of 3 grams per tonne or an intercept of 6 meters of 5 grams per tonne both have 30,000 cmg/t. By comparison a typical Merensky reef platinum mine would have 1 meter of 6 grams per tonne or 600 cmg/t.

New “Super” T – The following holes define an emerging Super T zone:

Earlier T zone drilling in this area up-dip from the Super T zone includes:

Central Super F

3 Shallow holes awaiting assays

Boundary Super F

WE080 4.15g/t 2E over 21.50meters from 297.00 meters to 318.50 meters.

Northern Super F

WE078D2 5.13 g/t 3E over 17.25 meters from 283.75 to 301 meters.

Drill Result Details

BHID
ZONE
FROM
TO
Length
3E
Pt
Pd
Au
meters
g/t
g/t
g/t
g/t
WE077D0
NSF
455.53
459.88
4.35
1.67
0.50
1.08
0.09
WE077D1
NSF
461.00
465.39
4.39
3.27
0.89
2.20
0.18
WE078D1
NSF
283.39
300.97
17.58
4.95
1.38
3.33
0.24
WE078D2
NSF
283.75
301.00
17.25
5.13
1.61
3.24
0.28
WE079D1
NSF
337.00
353.93
16.93
2.93
0.80
1.97
0.16
WE079D2
NSF
333.27
352.00
18.73
2.56
0.70
1.71
0.14

WE080D0
BSF
297.00
318.50
21.50
4.15
1.18
2.75
0.23
WE081D0
BSF
Beyond sub crop

WE082D0
BSF
342.00
353.06
11.06
5.72
1.77
3.72
0.24
WE082D1
BSF
342.00
352.89
10.89
5.33
1.56
3.55
0.22
WE082D2
BSF
342.00
352.91
10.91
5.57
1.62
3.76
0.20
WE083D0
BSF
248.50
258.00
9.50
2.96
0.92
1.89
0.16
WE083D1
BSF
247.00
256.50
9.50
3.10
0.84
2.13
0.13
WE084D0
BSF
216.50
225.50
9.00
3.75
1.08
2.43
0.25
WE085D0
BSF
292.00
299.65
7.65
2.64
0.87
1.53
0.24
WE086D0
BSF
Low grade

WE087D0
BSF
Beyond sub crop

WE088D0
BSF
Beyond sub crop

WE089D0
BSF
398.00

Awaiting assays
WE090D0
BSF
Beyond sub crop

WB202D0
BSF
250.00

Awaiting assays
WB203D0
BSF
Beyond sub crop

WB204D0
BSF
270.00

Awaiting assays

WB195D0
T-Zone
895.63
907.50
11.87
13.91
4.46
7.32
2.13
WB196D0
T-Zone
Replaced by dyke

WB197D0
T-Zone
937.91
944.00
6.09
2.17
0.80
1.13
0.24
WB198D0
T-Zone
635.00
641.85
6.85
2.76
1.25
1.35
0.15
WB199D0
T-Zone
572.50
580.40
7.90
1.32
0.54
0.69
0.09
WB200D0
T-Zone
938.44
946.00
7.56
5.92
1.67
3.46
0.79
WB201D0
T-Zone
770.00

Awaiting assays

WB205D0
CSF
415.00

Awaiting assays
WB206D0
CSF
388.00

Awaiting assays
WB207D0
CSF
310.00

Awaiting assays

MILESTONES

  • End of March 2016 – Resource update
  • April 1, 2016 – Commencement of new JOGMEC budget year for funding for US$ 5.5 million, 100% of project costs (part of a US$ 20 million commitment to 2018)
  • July 2016 – Pre-Feasibility Study completed
  • End 2016 – Application submission for a Mining Right
  • 2017 – Definitive Feasibility Study

For more information on these matters, please refer to Platinum Group’s information circular, available on SEDAR (www.sedar.com) or visit our website at www.platinumgroupmetals.net.

Qualified Person and Quality Assurance and Control

R. Michael Jones, P.Eng., the Company’s President, Chief Executive Officer and a significant shareholder of the Company, is a non-independent qualified person as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects and is responsible for preparing the technical information contained in this news release. He has verified the data by ensuring experienced qualified personnel are working with the core and data, reviewing selected core, core logs and assay data, visiting the site and drill rigs and ensuring that the Independent Qualified Person is updated in the project progress and plans. Assay results are part of an extensive quality control program including chain of custody, insertion of blanks and standards, carefully reviewing data on company standards and checking accuracy with independent lab checks. The assays have been completed at Bureau Veritas Inspectorate and Set Point accredited laboratories by standard fire assay and ICP finish methods.

About Waterberg

Waterberg was newly discovered by the Company and its joint venture partners including JOGMEC the Japanese State Company in late 2011. Waterberg was hidden from previous exploration by 140m of sedimentary cover which is the reason it was not previously found. Waterberg has been studied since its discovery in co-operation with Witwatersrand University and its mineralogy and age date have suggested it is a Bushveld Complex deposit but in a new set of layers and geological domain. Waterberg is not aligned with the classic South African platinum reefs of the Merensky, UG-2 or the Platreef. The Waterberg has been metallurgical tested and found to produce a desirable concentrate with similar characteristics to the preferred Merensky Reef.

Resources at Waterberg total:

25.64 million 3E ounces Inferred plus 12.61 million 3E ounces Indicated

Inferred – 246 million tonnes grading 3.25 g/t 3E (0.98 g/t Pt, 2.11 g/t, Pd, 0.16 g/t Au, 2.50 g/t cut-off)

Indicated – 121 million tonnes grading 3.24 g/t 3E (0.97g/t Pt, 2.11 g/t, Pd, 0.16g/t Au, 2.50 g/t cut-off)

(See Independent Technical Report by C. Muller of CJM Consulting South Africa (Pty) Ltd. dated Sept 4, 2015 at www.sedar.com for details)

These resources will be updated with the results of the drilling announced today and other drilling completed before the end of March 2016.

About Platinum Group Metals Ltd.

Platinum Group Metals Ltd., based in Johannesburg, South Africa and Vancouver, Canada, has a successful track record with more than 20 years of experience in exploration, mine discovery, mine construction and mine operations.

Formed in 2002, Platinum Group holds significant mineral rights in the Bushveld Igneous Complex of South Africa, which is host to over 70% of the world’s primary platinum production. The Company recently commissioned and began concentrate sales at the Maseve Platinum mine, a shallow, high-grade operation. Maseve is currently in ramp-up phase and is expected to produce 250,000 ounces (4E) per year on a steady state basis.

Platinum Group has expanded its exploration and development efforts on the North Limb of the Bushveld Complex at the Waterberg Project. Waterberg represents a new bulk type of platinum, palladium and gold deposit that is being studied for potential mechanized mining in partnership with Japanese state Company JOGMEC.

On behalf of the Board of Platinum Group Metals Ltd.

R. Michael Jones, CEO and Co-Founder

Disclosure

The Toronto Stock Exchange and the NYSE MKT LLC have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management. This press release may contain forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of U.S. securities laws (collectively “forward-looking statements”). Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, plans, postulate and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. Although the Company believes any forward-looking statements in this press release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements as a result of various factors. The Company directs readers to the risk factors described in the Company’s Form 40-F annual report, annual information form and other filings with the Securities and Exchange Commission and Canadian securities regulators, which may be viewed at www.sec.gov and www.sedar.com, respectively.

]]R. Michael Jones, President, or
Kris Begic, VP, Corporate Development
Platinum Group Metals Ltd., Vancouver
(604) 899-5450 / Toll Free: (866) 899-5450
www.platinumgroupmetals.net
]]





Previous: South Africa in the News on 17 March 2016
Next: South Africa in the News on 18 March 2016





Filed Under: South Africa Tagged With: news, south africa

RSS Events

  • Soweto Gets a New Summer Lifestyle Festival as Sugar People & Friends Celebrates Its First Birthday
  • Deftones Setlist: What to Expect From Their 2027 Live Show
  • Hyde Park Corner Brings Out the Stars for This Year’s Spectacular Tree Lighting Celebration!
  • Step Inside: Prudential Center – Home of the New Jersey Devils
  • Exclusive November Imax Lineup Features Iconic Music Legend and a Hollywood Blockbuster
  • Kasi Republic Brings Kwaito, Kasi Cars and Ispantsula Style to Riversands Farm Village This Reconciliation Day
  • Festive Shopping Made Simple at Solly Kramer’s Parkhurst
  • LEDBox Hires Outdoor LED Screen Trailers with On-Site Crew
  • From Busking to the Business of Music: MEX Opens New Doors
  • P!NK Setlist: What to Expect From Her 2027 Live At Sphere Residency

About admin

The one with a "My Complex" - incurable but fun. Grumpy, Cynical, Wise and Idiotic. I can also be found HERE.

Footer

Latest News from Africa

  • Prince Albert – the New King of Jazz
  • Eritrea: Independence Cup in Southern Region
  • President El-Sisi Follows-up on the Evacuation of Egyptian Citizens from Sudan
  • United Arab Emirates welcomes initiation of talks between Sudanese Armed Forces and Rapid Support Forces
  • Ghana’s regions: why creating new territories has caused problems
  • Uganda Red Cross Delivers Relief Aid to Kisoro Floods-Affected Communities
  • President Ramaphosa alarmed over conflict, violence in eastern DRC
  • Mental health: almost half of Johannesburg students in new study screened positive for probable depression
  • Dietary Supplements for Dogs and Cats: Enhancing Well-being
  • Midwives scramble to ensure safe deliveries amid violence in Sudan

RSS MyPR’s Free Press Releases

© 2026 MyZA · Port Elizabeth, South Africa | Privacy Policy | MyZA content usage