{"id":185148,"date":"2021-04-02T00:19:26","date_gmt":"2021-04-01T22:19:26","guid":{"rendered":"https:\/\/www.groundup.org.za\/article\/dunoon-shack-dwellers-start-roll-out-basic-services-themselves\/"},"modified":"2021-04-02T00:19:26","modified_gmt":"2021-04-01T22:19:26","slug":"tired-of-waiting-for-government-dunoon-shack-dwellers-build-a-sewage-system","status":"publish","type":"post","link":"https:\/\/www.myza.co.za\/press\/tired-of-waiting-for-government-dunoon-shack-dwellers-build-a-sewage-system\/","title":{"rendered":"Tired of waiting for government, Dunoon shack dwellers build a sewage system"},"content":{"rendered":"<div id=\"article_body\">\n<p><a class=\"bigger-image\" href=\"https:\/\/www.groundup.org.za\/media\/uploads\/images\/photographers\/Peter%20Luhanga\/trenches.jpeg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" alt=\"Photo of long trenches on an informal settlement\" src=\"http:\/\/www.myza.co.za\/press\/wp-content\/uploads\/2021\/04\/tired-of-waiting-for-government-dunoon-shack-dwellers-build-a-sewage-system.jpg\"><\/a><\/p>\n<p class=\"caption\">Residents dug trenches, installed sewer pipes and connected them to flush toilets they had bought and installed themselves. Photo: Supplied.<\/p>\n<p>Residents in an informal settlement in Dunoon near Milnerton, Cape Town, have started their own sewage system. They have bought and installed flush toilets together with the sewage pipes.<img loading=\"lazy\" decoding=\"async\" alt class=\"leave\" height=\"1\" id=\"gu_counter\" src=\"http:\/\/www.myza.co.za\/press\/wp-content\/uploads\/2021\/04\/tired-of-waiting-for-government-dunoon-shack-dwellers-build-a-sewage-system.gif\" width=\"1\"><\/p>\n<p>Households were asked to contribute R700. Those who could not afford to contribute, provided labour for free, digging sewer trenches. They then connected the pipes to a municipal sewer line.<\/p>\n<p>Thembelani Ndebesimbi, a community leader in Ekupholeni informal settlement, located on a municipal sports field, installed his own flush toilet in his shack. \u201cIf you wait for the City to render services, you will wait forever,\u201d he said.<\/p>\n<p>He said he had been on the housing waiting list for ages. \u201cWe asked for serviced plots. They could not give that \u2026 We made provision for our own water services and then toilets.\u201d<\/p>\n<p>Ndebesimbi said they started with water in 2018, just months after occupying the land. Then they started sewage. Now 16 homes have flush toilets, which neighbours share.<\/p>\n<p>He says they have qualified plumbers living in the settlement. \u201cWe didn\u2019t pay them. They did it pro bono. Those of us who don\u2019t have plumbing skills, we dug the trenches.\u201d<\/p>\n<p>Community leader Pesi Masigcinane said, \u201cTo stay in a place without water and electricity, without toilets \u2013 there is no dignity. So the best way is to contribute money and do things on our own, because we would wait forever.\u201d<\/p>\n<p>Mayco Member for Water and Waste Councillor Xanthea Limberg said that according to the municipal by-laws to protect the sewer system \u201cthe City has the authority to remove [these] illegal connections\u201d.<\/p>\n<p>\u201cAn investigation will be conducted by the City\u2019s Water Pollution Control Inspectorate and appropriate action will then be taken based on the outcome,\u201d said Limberg.<\/p>\n<p>\u201cThe risk for possible environmental pollution and associated health risks is high if undertaken by unqualified and inexperienced people. Should untrained people fix blockages, it can also cause further blockages upstream,\u201d said Limberg.<\/p>\n<p>Meanwhile, some residents in the informal settlement have started to build structures with brick and mortar instead of temporary materials.<\/p>\n<\/div>\n<div id=\"article-copyright\">\n<p>\u00a9 2021 GroundUp. This article is licensed under a <a href=\"http:\/\/creativecommons.org\/licenses\/by-nd\/4.0\/\" rel=\"license\">Creative Commons Attribution-NoDerivatives 4.0 International License<\/a>.<\/p>\n<p>You may republish this article, so long as you credit the authors and GroundUp, and do not change the text. Please include a link back to the original article.<\/p>\n<p>We put an invisible pixel in the article so that we can count traffic to republishers. All analytics tools are solely on our servers. We do not give our logs to any third party. Logs are deleted after two weeks. We do not use any IP address identifying information except to count regional traffic. We are solely interested in counting hits, <b>not tracking<\/b> users. If you republish, please do not delete the invisible pixel.<\/p>\n<\/div>\n<p><img decoding=\"async\" src=\"http:\/\/www.myza.co.za\/press\/wp-content\/uploads\/2021\/04\/tired-of-waiting-for-government-dunoon-shack-dwellers-build-a-sewage-system.jpg\"><a href=\"https:\/\/www.groundup.org.za\/\">Source: GroundUp<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Residents dug trenches, installed sewer pipes and connected them to flush toilets they had bought and installed themselves. Photo: Supplied. Residents in an informal settlement in Dunoon near Milnerton, Cape Town, have started their own sewage system. They have bought and installed flush toilets together with the sewage pipes. Households were asked to contribute R700. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":185149,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","ngg_post_thumbnail":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[9928],"tags":[28001],"class_list":{"0":"post-185148","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-groundup","8":"tag-groundup","9":"entry"},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/www.myza.co.za\/press\/wp-content\/uploads\/2021\/04\/tired-of-waiting-for-government-dunoon-shack-dwellers-build-a-sewage-system.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/posts\/185148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/comments?post=185148"}],"version-history":[{"count":0,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/posts\/185148\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/media\/185149"}],"wp:attachment":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/media?parent=185148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/categories?post=185148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/tags?post=185148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}