{"id":202155,"date":"2021-09-16T00:44:58","date_gmt":"2021-09-15T22:44:58","guid":{"rendered":"https:\/\/mypr.co.za\/?p=107571"},"modified":"2021-09-16T00:44:58","modified_gmt":"2021-09-15T22:44:58","slug":"why-solar-companies-are-reluctant-to-certify-your-diy-sseg","status":"publish","type":"post","link":"https:\/\/www.myza.co.za\/press\/why-solar-companies-are-reluctant-to-certify-your-diy-sseg\/","title":{"rendered":"Why Solar Companies are Reluctant to Certify YOUR DIY SSEG"},"content":{"rendered":"<p>Many suppliers of solar equipment are promoting DIY solar power equipment aimed at the enthusiastic handyman looking to save a buck on a renewable energy generation system.<\/p>\n<p>Inevitably the DIY Installer hits a brick wall when looking to take advantage of Grid Tie by applying for the installation of a bi-directional Smart Meter as part of an \u2018Application for the connection of Small Scale Embedded Generation (SSEG)\u2019 from the local Municipality.<\/p>\n<figure id=\"attachment_90219\" aria-describedby=\"caption-attachment-90219\" class=\"wp-caption alignleft\"><a href=\"https:\/\/straton.co.za\/solar\/\"><img loading=\"lazy\" decoding=\"async\" alt width=\"375\" height=\"157\" data-sizes=\"(max-width: 375px) 100vw, 375px\" class=\"wp-image-90219 size-full lazyload\" src=\"http:\/\/www.myza.co.za\/press\/wp-content\/uploads\/2021\/09\/why-solar-companies-are-reluctant-to-certify-your-diy-sseg.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-90219 size-full\" src=\"http:\/\/www.myza.co.za\/press\/wp-content\/uploads\/2021\/09\/why-solar-companies-are-reluctant-to-certify-your-diy-sseg.png\" alt width=\"375\" height=\"157\"><\/a><figcaption id=\"caption-attachment-90219\" class=\"wp-caption-text\">041 505 4600<\/figcaption><\/figure>\n<p>Essentially this application is the last step in the journey to Grid Tie and needs to be completed by a professional well versed with the installation and the regulations surrounding such connections to the Grid.<\/p>\n<p>\u201cOne needs to appreciate that the regulations are there for a purpose \u2013 to protect consumers and users of the Grid and as such it is vital for a professional to complete the application,\u201d says Alan Straton from <a href=\"https:\/\/straton.co.za\/solar\">Straton Solar<\/a>.<\/p>\n<p>The application seeks specific details and measurements from the system installed along with a professional registration number and signature attesting to the safety of the installation. Essentially the professional is being told that he\/she carries the responsibility for the system.<\/p>\n<p><strong>The professional signs the following declaration:<\/strong><\/p>\n<blockquote>\n<p><em>I request Nelson Mandela Bay Municipality to proceed with a preliminary review of this embedded generation interconnection application and I agree to pay the cost associated with completing this review and written consent of Nelson Mandela Bay Municipality.<\/em><\/p>\n<p><em>I further consent to Nelson Mandela Bay Municipality providing this information to the National Electricity Regulator of SA (NERSA) and other Distributors as required.<\/em><\/p>\n<p><em>I declare that this installation has been designed to comply with the requirements of Nelson Mandela Bay Municipality\u2019s Electricity and Energy Directorate.<\/em><\/p>\n<p><em>I declare that the grid connected generator interconnection equipment has been type-test certified to comply with the minimum technical requirements of NRS 097-2-1.<\/em><\/p>\n<\/blockquote>\n<p>In essence the professional submitting the application certifies that the installation complies to a whole host of Regulatory Approvals, Requirements and Normative References.<\/p>\n<p><strong>Depending on the type of renewable energy installation these Regulatory Approvals could consist of some or all of the following:<\/strong><\/p>\n<ul>\n<li>Electricity Regulation Act, Act 4 of 2006 and Electricity Regulation Amendment Act, 2006<\/li>\n<li>Department of Environmental Affairs &amp; Tourism in terms of Environmental Conservation Act, No. 73 of 1989 and National Environmental Management Act, No. 107 of 1998, (as amended)<\/li>\n<li>Occupational Health &amp; Safety Act, No. 85 of 1993 as amended<\/li>\n<li>Compulsory Specifications Act, No. 5 of 2008<\/li>\n<li>South African Distribution Code (all parts)<\/li>\n<li>South African Grid Code (all parts)<\/li>\n<li>Nelson Mandela Bay Municipal By-laws<\/li>\n<li>IEC 60068-2-1: Environmental Testing \u2013 Part 1 Cold<\/li>\n<li>IEC 60068-2-1: Environmental Testing \u2013 Part 2 Dry Heat<\/li>\n<li>IEC 60068-2-30: Environmental Testing \u2013 Part 30 Damp Heat, cyclic (12h + 12h cycle)<\/li>\n<li>IEC 60255-3: Electrical relays \u2013 Part 3: Single input energizing quantity measuring relays with dependent and independent time<\/li>\n<li>IEC 60255-6: Electrical relays \u2013 Part 6: Measuring relays with dependent and protection equipment<\/li>\n<li>IEC 60255-21: Electrical relays \u2013 Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment (all sections)<\/li>\n<li>IEC 60255-22: Electrical relays \u2013 Part 22: Electrical disturbance tests for measuring relays and protection equipment (all sections)<\/li>\n<li>IEC 61727: Photovoltaic (PV) systems \u2013 Characteristics of the utility interface.<\/li>\n<li>IEC 62271 -100: High voltage alternating current circuit breakers<\/li>\n<li>IEC 62116: Test procedure of islanding prevention measures for utility-interconnected photovoltaic inverters<\/li>\n<li>IEEE 1547: IEEE Standard for interconnecting distributed resources with electrical power systems<\/li>\n<li>IEEE 1547-1: IEEE Standard conformance test procedures for equipment interconnecting Distributed resources with electric power systems<\/li>\n<li>NRS 031: Alternating current disconnectors and earthing switches (above 1000V)<\/li>\n<li>NRS 048-2: Electricity Supply \u2013 Quality of Supply Part 2: Voltage characteristics, compatibility levels, limits and assessment methods.<\/li>\n<li>NRS 048-4: Electricity Supply \u2013 Quality of Supply Part 4: Application guidelines for utilities<\/li>\n<li>NRS 048-7: Electricity Supply \u2013 Quality of Supply Part 7: Application practices for end-users<\/li>\n<li>NRS 057(SANS 474): Code of Practice for Electricity Metering<\/li>\n<li>NRS 097-1: Code of Practice for the interconnection of embedded generation to electricity Distribution networks: Part 1 MV and HV<\/li>\n<li>Page 3 of 6NRS 097-2: Grid interconnection of embedded generation: Part 2 Small scale embedded generation.<\/li>\n<li>SANS 1019: Standard voltages, currents and insulation levels for electricity supply<\/li>\n<li>SANS IEC 60529: Degrees of protection provided by enclosures (IP Code)<\/li>\n<li>SANS IEC 61000-4: Electromagnetic compatibility (EMC): Test and measurement techniques (all sections)<\/li>\n<\/ul>\n<p>Based on the above <a href=\"https:\/\/straton.co.za\/solar\">Straton Solar<\/a> will not sign off on any Renewable Energy installation NOT done by our own staff or under our general control.<\/p>\n<p><strong>Video:<\/strong> Why Solar Companies are Reluctant to Certify YOUR DIY SSEG<\/p>\n<p>[embedded content]<\/p>\n<p><strong>More Info on Why Solar Companies are Reluctant to Certify YOUR DIY SSEG here:<\/strong> <a href=\"https:\/\/straton.co.za\/solar\" target=\"_blank\" rel=\"nofollow noopener\">https:\/\/straton.co.za\/solar<\/a><br \/><strong>Twitter<\/strong>: <a href=\"https:\/\/twitter.com\/MyPE\" target=\"_blank\" rel=\"nofollow noopener\">https:\/\/twitter.com\/MyPE<\/a><br \/><strong>Facebook<\/strong>: <a href=\"https:\/\/www.facebook.com\/StratonElectrical\/\" target=\"_blank\" rel=\"nofollow noopener\">https:\/\/www.facebook.com\/StratonElectrical\/<\/a><\/p>\n<p><a href=\"http:\/\/mypr.co.za\/save-with-myprs-monthly-flat-fee\/\">CLICK HERE to submit your press release to MyPR.co.za<\/a>.<\/p>\n<div class=\"entry-pagination pagination\">Pages: <span class=\"post-page-numbers current\"><span class=\"screen-reader-text\">Page <\/span>1<\/span> <a href=\"https:\/\/mypr.co.za\/why-solar-companies-are-reluctant-to-certify-your-diy-sseg\/2\/\" class=\"post-page-numbers\"><span class=\"screen-reader-text\">Page <\/span>2<\/a><\/div>\n<p><a href=\"https:\/\/mypr.co.za\">Source: MyPR.co.za<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Many suppliers of solar equipment are promoting DIY solar power equipment aimed at the enthusiastic handyman looking to save a buck on a renewable energy generation system. Inevitably the DIY Installer hits a brick wall when looking to take advantage of Grid Tie by applying for the installation of a bi-directional Smart Meter as part [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":202156,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","ngg_post_thumbnail":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3331,18,3332,9021,3330,3336,1],"tags":[3257],"class_list":{"0":"post-202155","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-cape-town","8":"category-durban","9":"category-johannesburg-south-africa","10":"category-mypr","11":"category-port-elizabeth","12":"category-pretoria-south-africa","13":"category-south-africa","14":"tag-mypr","15":"entry"},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/www.myza.co.za\/press\/wp-content\/uploads\/2021\/09\/why-solar-companies-are-reluctant-to-certify-your-diy-sseg.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/posts\/202155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/comments?post=202155"}],"version-history":[{"count":0,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/posts\/202155\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/media\/202156"}],"wp:attachment":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/media?parent=202155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/categories?post=202155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/tags?post=202155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}