{"id":216475,"date":"2022-02-14T10:16:31","date_gmt":"2022-02-14T08:16:31","guid":{"rendered":"https:\/\/www.myza.co.za\/parliaments-visual-assessment-report-concluded\/"},"modified":"2022-02-14T10:16:31","modified_gmt":"2022-02-14T08:16:31","slug":"parliaments-visual-assessment-report-concluded","status":"publish","type":"post","link":"https:\/\/www.myza.co.za\/press\/parliaments-visual-assessment-report-concluded\/","title":{"rendered":"Parliament\u2019s visual assessment report concluded"},"content":{"rendered":"<div><img decoding=\"async\" src=\"https:\/\/www.sanews.gov.za\/sites\/default\/files\/2012\/images\/newsstorytemplate\/202202\/report.jpg\" class=\"ff-og-image-inserted\"><\/div>\n<p>The professional team comprising structural, civil, electrical, and mechanical engineers has conducted and concluded a high level preliminary visual assessment of the damages caused by fire in Parliament\u2019s buildings, including the safety aspect of the site.<\/p>\n<p>The team was appointed by Public Works and Infrastructure Minister Patricia de Lille.<\/p>\n<p>The professional team\u2019s visual assessment started with the Old National Assembly and then proceeded to assess the structural damages to the New National Assembly.<\/p>\n<p>Minister de Lille said on the basis of the preliminary visual inspections, there was evidence of severe structural damage (major spalling) to the slabs.<\/p>\n<p>\u201cThe slabs affected by the damage are the 2nd, 3rd and 4th floor. In addition, there were major cracks in the walls on the 2nd and 3rd floor. The professional team advised that the New Assembly Building is unsafe and should be cordoned off and closed in order to restrict access,\u201d De Lille said.<\/p>\n<p>De Lille said her department had activated appropriate steps for the procurement of an independent specialist engineering team to conduct further detailed assessments and testing of material strength.<\/p>\n<p>De Lille said the National Treasury had agreed to expedite the process to procure the independent specialist engineering team as expeditiously as possible.<\/p>\n<p>\u201cDPWI\u2019s Bid Evaluation Committee recommended COEGA be appointed for the independent assessment,\u201d the Minister said.<\/p>\n<p>In close consultation with the National Treasury, on Friday, DPWI appointed COEGA Development Cooperation to perform assessments of the fire damaged buildings at Parliament.<\/p>\n<p>Following the DPWI Engineering Services\u2019 recommendation that specialised structural engineering assessment work be undertaken in order for the buildings to be made safe for access, a scope of works was generated from the DPWI\u2019s Engineering Services team for this work.<\/p>\n<p><strong>The scope of work for the assessment by COEGA includes:<\/strong><\/p>\n<p>\u2022 Assessment of the fire damaged buildings in the parliamentary precinct to pronounce on the extent of the damage.<\/p>\n<p>\u2022 Provide professional advice on the safety of the structures.<\/p>\n<p>\u2022 Provide measures to temporarily make the structure safe to allow the investigations to proceed unhindered.<\/p>\n<p><strong>Detailed assessment report<\/strong><\/p>\n<p>Following the submission of the initial assessment report, the service provider must submit a detailed assessment report that covers the following aspects:<\/p>\n<p>&#8211; Detailed assessment report indicating the extent of the damage and any other structural issues.<\/p>\n<p>&#8211; Pronouncement on the residual strength of the structure (including all relevant tests and analysis).<\/p>\n<p>&#8211; Proposed restorative measures with associated cost comparisons for restoration.<\/p>\n<p>&#8211; Proposed estimate of the rehabilitation project.<\/p>\n<p>&#8211; Proposed preliminary cost estimate of the rehabilitation project.<\/p>\n<p>&#8211; Pronouncement on possible long-term restorative measures.<\/p>\n<p>De Lille said she is pleased that the appointment is finalised and that she is eager to see the teams get to work and provide detailed assessments of the damage, rehabilitation and restorative measures and restoration costs.<\/p>\n<p>\u201cI am grateful to the officials at National Treasury for their advice and support to DPWI to finalise the appointment of this team of assessors and have impressed on the department to ensure that the work is conducted thoroughly and as soon as possible,\u201d the Minister said. \u2013&nbsp;<strong>SAnews.gov.za<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The professional team comprising structural, civil, electrical, and mechanical engineers has conducted and concluded a high level preliminary visual assessment of the damages caused by fire in Parliament\u2019s buildings, including the safety aspect of the site. The team was appointed by Public Works and Infrastructure Minister Patricia de Lille. The professional team\u2019s visual assessment started [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":216476,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","ngg_post_thumbnail":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[38678],"class_list":{"0":"post-216475","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-south-africa","8":"tag-sanews","9":"entry"},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/www.myza.co.za\/press\/wp-content\/uploads\/2022\/02\/parliaments-visual-assessment-report-concluded.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/posts\/216475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/comments?post=216475"}],"version-history":[{"count":0,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/posts\/216475\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/media\/216476"}],"wp:attachment":[{"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/media?parent=216475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/categories?post=216475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myza.co.za\/press\/wp-json\/wp\/v2\/tags?post=216475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}